| 1961 |
Construction of the Kuibyshev Nitrogen Fertilizer Plant was started |
| 1965 |
The first production facilities – Weak Nitric Acid and Ammonium Nitrate Plants – began operating on brought-in ammonia |
| 1966 |
The Air Separation Plant yielded gaseous nitrogen and oxygen Launching of the 1st Ammonia Line |
| 1968 |
Commissioning of the Urea Plant |
| 1969 |
Start-up of the Strong Nitric Acid Plant |
| 1970 |
Launching of the 2nd Ammonia Line |
| 1974 |
Commissioning of Caprolactam, Cyclohexanone and Ammonium Sulphate Complex (1st Line) |
| 1977 |
Launching of the 3rd Ammonia Line (large capacity plant) |
| 1985 |
Commissioning of the Argon Plant.
The Urea Plant was revamped to expand its capacity. |
| 1988 |
The Liquid Fertilizers (UAN Solution) Plant went on stream |
| 1991 |
The Strong Nitric Acid plant was closed down due to its obsolescence |
| 1993 |
Commissioning of the 2nd Line (complex) of Caprolactam, Cyclohexanone and Ammonium Sulphate Two Air Separation Units were put into operation to provide oxygen and nitrogen of high purity.
The Sulphur Incineration Unit and the Rashig Hydroxylamine Sulphate Production were taken out of service due to their obsolescence. |
| 1994 |
Foam detergents, shampoo and polyethylene packaging production was launched at a new plant.
Revamping and expansion of the UAN Solution Plant.
The 1st and 2nd Ammonia Lines were put out of operation due to obsolescence. |
| 1996 |
Commissioning of the Hydrogen Plant. |
| 1997 |
The Nitro- /Denitrification Unit for waste water treatment became operational. |
| 1997—2000 |
Revamping of the large scale Ammonia Plant to expand its capacity from 1360 to 1600 t/d and to reduce specific consumption of natural gas. |
| 2001 |
Construction for the new Polyamide 6 Project was started.
The improved 2-stage Rearrangement of Cyclohexanoxime (section in caprolactam production) was put into service, which resulted in better quality of the product and reduced raw material consumption. |
| 2002 |
The rectification stage in caprolactam production was revamped to reduce utilities consumption Construction of Industrial Yarn and Cord Fabric Plants was started. |
| 2003 |
Polyamide-6 was launched. Trial output of calcium ammonium nitrate. A new power complex, capacity 6MW, was brought on stream. Completion for the silt treating facilities at the water treatment unit.
|
|
2004
2005
2006
2007
|
Commissioning of the high-tenacity Industrial Yarn and Cord Fabric Plants.
Construction of a 2nd line at the Polyamide-6 plant was started.The company gets “A+” rating on the national scale by “AK&M-RASO” rating consortium.
Commisioning of the new hydrogen plant.
Commisioning of the 2nd line of polyamide-6 production.
Start-up of the 3rd line e of polyamide-6 plant.
Certification of the integrated management system for compliance with the international and Russian standards: ISO 9001:2000, ISO 14001:2004 è OHSAS 18001:1999.
Start-up of the engineering plastics capacity at Kuibyshevazot Engineering Plastics (Shanghai) Co., Ltd. in China.
The food grade carbon dioxide plant as a JV was started up at the site of KuibyshevAzot.
The acquisition of the Kurskkhimvolokno plant.
|